Plug and Play
By bridging the gap between the TMS FNC Gantt Chart and various database systems, this feature empowers developers to leverage the full potential of their data assets. To get started it is as simple as Plug and Play. Put a TTMSFNCGantChart and TTMSFNCGanttChartDataBaseAdapter on the form together with a DataSource and with just a few properties you can start, no code needed.
The Database Adapter will automatically update all of the changes from the Gantt Chart to your database.
Connect a DataSource to the Adapter and link the database fields with the respective properties.
For an ideal use we advise to have a field that has the database key and a field for the WBS (work breakdown structure e.g. 2.1). (These are the warning signs in the image above.)
The hint is related to the Duration field. With the property EndTimeType you have the option to use the Duration or the Planned End field to indicate how long the task takes. (The default value is Planned End as we assume that this is used more, but for a more optimal performance it is advised to use the Duration field as this will only use the worktime calculation once.)
Effortless implementation, Maximum Flexibility
The Database Adapter is designed with ease of implementation in mind. But if you are already working with an existing database that doesn't map fully on this implementation. We have added a lot of additional events to effortlessly access and manipulate your data.
Get Started Today
With the Database Adapter for TMS FNC Gantt Chart, the possibilities are endless. Whether you're building project management tools, resource planning applications, or any other data-driven solution, this powerful feature empowers you to deliver exceptional results with unparalleled efficiency and precision.
Ready to revolutionize your application development process? Visit the product page to learn more, download a free trial, and embark on a journey of innovation and success with the TMS FNC Gantt Chart. As a demo application for the Database Adapter is available in the Demos folder after installation.
If you are interested in this product or a combination of other TMS FNC products, for the introduction period of the new TMS FNC Gantt Chart, we keep TMS FNC Component Studio and TMS ALL-ACCESS pricing unchanged.
So, take advantage of these special introduction conditions to get an incredible value for money with these bundles!